Agency Units - New York City

Boiler Unit. The Boiler Division oversees the installation, operational safety and enforcement inspection compliance of boilers in New York City. The Boiler Technical Unit ensures the safe installation and operation of low and high pressure boilers and related equipment by performing inspections and audits.

Learn More

Service Updates 2016 - New York City

Inspection Ready: Scenarios for Boiler Inspection Work-Type Requests Effective May 20, 2016, Licensed Professionals requesting a boiler inspection on a job application containing a Boiler (BL), Fuel Burner (FB), and Fuel Storage (FS) work-type are required to only make a single request under the highest boiler work-type hierarchy.

Learn More

Dairy Product Manufacturers (4/95) | FDA

Boiler water treatment compounds should comply with 21 CFR 173.310 If direct injection into product, steam should be properly filtered, piped and trapped. (PMO, Appendix H, IV).

Learn More

Silica Analyzer | Phosphate Analyzer

Silica and phosphate analyzers are reliable on-line instruments designed for pure water treatment and power cycle chemistry monitoring. METTLER TOLEDO offers a combined silica analyzer and phosphate analyzer in a compact design for flexibility with less complexity, for on-line water quality monitoring.

Learn More

Welcome | One Stop License Portal

Welcome to the License and Inspection Portal! This new portal houses state licensing and inspection services in a one-stop shop. It is a part of our mission to deliver a more effective, more efficient, and more customer-friendly experience for you as we work together

Learn More

Water Handbook - Boiler System Failures | SUEZ

In the case of industrial process contamination, it is possible for organic contaminants to decompose under boiler temperature and pressure to form organic acids. Sugar is an excellent example of an organic which, when returned in a large quantity, can cause rapid loss of boiler water alkalinity and reduce pH of the boiler water to 4.3 and lower.

Learn More

What is CIQ - China inspection and Quarantine | AQSIQ branch

By the technical process, and by the inspection and quarantine authorities of the re-inspection before installation. other than statutory inspection of imported goods, the inspection and quarantine authorities failed a random inspection, in accordance with the provisions of 4 treatment.

Learn More

VHA Directive 1810 Boiler and Boiler Plant Operations

b. Boiler and boiler plant safety and reliable operation are dependent on: the presence of a qualified operator in the boiler plant 24 hours a day, 7 days a week and all other locations outside the boiler plant having decentralized boilers (operating at high pressure) for continuous monitoring and operation; supervision by a foreman

Learn More

Dawsons | The Complete Industrial Solution

Dawsons provided fabricated items, Project Management, Supervision, Trades and Equipment Hire for the installation of an Agitair Float Circuit in the Copper Concentrator in Mount Isa. All works were completed ahead of schedule with good safety and quality outcomes.

Learn More

Plumber - Wikipedia

Plumbing work is defined in the Australian Standards (AS3500) Regulations 2013 and refers to any operation, work or process in connection with installation, removal, demolition, replacement, alteration, maintenance or repair to the system of pipes and fixtures that conveys clean water into and liquid waste out of a building.

Learn More