Texas Boiler Administrative Rules

(a) The owner or operator of a boiler in this state must submit a boiler installation report to the department within thirty (30) days after completion of a boiler installation. (b) The boiler shall not be test-fired or operated prior to the required first inspection except as allowed under subsection (c). (c) Temporary Boiler Operating Permit.

Learn More

Safety and Health | Department of Labor

May 04, 2021 · The Public Employee Safety and Health Bureau (PESH), created in 1980, enforces safety and health standards promulgated under the United States Occupational Safety and Health Act (OSHA) and several state standards.

Learn More

Agency Units - New York City

Boiler Unit. The Boiler Division oversees the installation, operational safety and enforcement inspection compliance of boilers in New York City. The Boiler Technical Unit ensures the safe installation and operation of low and high pressure boilers and related equipment by performing inspections and audits.

Learn More

aaplesarkar.mahaonline.gov.in

Transfer of Ownership of Steam Boiler within Maharashtra Issuing Certified Copy- C) Tippen Area Book, Field Book. Statement, Phalni, Kate-phalni, Sub-division form no4, Akarphod Sceme Copy, Akarband, Gut Map, Measurment map, K.J.P., Enquiry Register, & other records on which is Excise Duty has been paid at special rates i.e. license in

Learn More

Electrician Administrative Rules

(b) To obtain a license without examination, an applicant must have been licensed for the preceding year by a municipality or regional licensing authority that has terminated its licensing program and have applied for a state issued license within ninety days of the date the program stopped issuing

Learn More

Fees | City of Ontario, California

For the installation or relocation of each boiler or compressor over 3 horsepower (10.6kW) or each absorption system to and including 100,000Btu/h (29.3 kW) 172.00 For the installation or relocation of each boiler or compressor over 3 horsepower (10.6kW) to and including 15 horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3

Learn More

Application For Original Contractors License Waiver -CSLB

Business Name Styles (Box 1). In accordance with BPC section 7059.1, the business name for a contractor license must not be misleading in relation to the classification(s) issued to the license and must be compatible with the type of business entity licensed (see Section 2 below).For example, it would not be acceptable for ABC123 Tile to apply for a C-10 Electrical contractor license, but it

Learn More

Texas Electrical Safety and Licensing Act

(b) A person who holds a residential appliance installer's license issued or recognized under this chapter may only be assigned to a single residential appliance installation contractor, unless the residential appliance installer owns more than 50 percent of the residential appliance installation

Learn More

Statutes & Constitution :View Statutes : Online Sunshine

4. Any unit or group of units in a condominium, cooperative, or timeshare plan and any individually or collectively owned one-family, two-family, three-family, or four-family dwelling house or dwelling unit that is rented for periods of at least 30 days or 1 calendar month, whichever is less, and that is not advertised or held out to the public as a place regularly rented for periods of less

Learn More

Department of Labor and Workforce Development | Boilers

A boiler operator holding a boiler operator in charge license may act as chief engineer of an installation of 500 boiler horsepower or less. He or she may assume charge of a shift, under the supervision of a properly licensed chief engineer, in installations not over 1,000 boiler horsepower.

Learn More